The 648MW solar project was pre-conceptualized by our engineers with effective cost-to-benefit analyses for all the commercially proven technologies even before the project was given to SgurrEnergy India.
SgurrEnergy assembled its diverse, integrated team of experts to ensure an on time and on budget delivery, including solar advisors, electrical, civil, structural, and infrastructure engineers, plus project managers with a history of designing projects that maximize the value of the solar asset.
Design innovation was implemented throughout the project, including a modular design to reduce execution time, and an eight row module table was utilized for the first the time in India, reducing the project costs and construction timeline. Because land for the project was not all available at the onset, SgurrEnergy was very flexible in its design process in order to minimize land requirements.