Project Overview

The 40MW project is currently under-construction. The project consist of JA solar make monocrystalline PV modules and ABB make central inverters.

Scope of Work

SgurrEnergy is appointed by one of the leading EPC contracting and technology group to help them implement their turnkey solar contracting project. We supported the client during the pre-bidding stage by preparing technical aspects of their proposal,assiting them in ascertaining optimum project guarantee and warranty, choosing the best suited technology configuration considering the project location and assistance in finalizing EPC and O&M agreement etc.

Further, SgurrEnergy is involved in preparing engineering designs, documents manufacturing quality plans, field quality plans, resource planning, pre-commissioning procedures checklist and O&M manual.

Project Status

Under Construction